This is a Preprint and has not been peer reviewed. This is version 1 of this Preprint.
Implications of impact-energy dependent erosional efficiency on bedrock river sediment dynamics and form: 1. Reach-scale dynamics and the effective flood
Downloads
Authors
Abstract
Bedrock river incision reflects the cumulative geomorphic work performed across a distribution of flood magnitudes and frequencies. Mechanistic models of bedrock incision by bedload impacts typically assume that bedrock resistance to erosion is constant with respect to particle impact energy. However, recent impact experiments demonstrate that rock resistance to erosion decreases systematically as impacts become more energetic. Here we incorporate experimentally constrained, impact-energy-dependent rock-resistance coefficient into the widely used saltation-abrasion model and evaluate how this modification alters predicted incision across a range of grain sizes and transport conditions. We find that allowing resistance to scale with impact energy strongly amplifies the grain-size dependence of detachment, such that coarse grains remove substantially more bedrock rock per impact. Applying the model across a full discharge distribution to evaluate long-term incision reveals that while impact-energy-dependent rock resistance does not meaningfully alter the effective floods, it shifts cumulative incision toward rarer, high-magnitude events. These results demonstrate that accounting for impact-driven differences in erosional efficiency fundamental alters how geomorphic work is distributed across floods, increasing the contribution of extremes to long-term bedrock erosion rates.
DOI
https://doi.org/10.31223/X5WF5V
Subjects
Earth Sciences, Geomorphology
Keywords
sediment transport, erosion, fluvial geomorphology, bedrock rivers
Dates
Published: 2026-03-10 09:43
Last Updated: 2026-03-10 09:43
License
CC BY Attribution 4.0 International
Additional Metadata
Conflict of interest statement:
None
Data Availability:
Code is available in a Zenodo repository draft linked in the pre-print. The Zenodo repository is currently accessible as a draft with the sharing link below, however, the data are not yet formally published with a DOI. The formally published data will be cited here and linked with a DOI following review. This delay is to enable edits to the dataset if substantive methodological changes are suggested during the review process resulting in material changes to the data.
Metrics
Views: 8
Downloads: 0
There are no comments or no comments have been made public for this article.